New Jianfa Building Project

Newly-built Instant Building Project (2011-2012, 180 million)
Project Name: Newly-built Building Project Phase: Environmental Impact Assessment Construction Period: 2011-2012

Major equipment: building materials, exterior wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instrumentation, water supply and drainage systems, fire fighting systems, pipe fittings, water supply equipment, Outdoor Drainage, Building Electrical, Lighting Fixtures, Low Voltage Electrical Appliances, Wire and Cable, Weak Current Systems, Lightning Protection Systems, Low Voltage Distribution Cabinets (for reference only)
Project Profile: The project is located at the junction of Lanzhou Road and Xinxing Road. It mainly consists of a 25-storey hotel (302 court rooms, 400 beds), underground parking, and supporting facilities; it mainly deals in catering and accommodation, and has a bank and business. Centers, conference rooms, recreation and leisure centers, office buildings and other facilities; 283 parking lots in underground parking lots. The project covers an area of ​​9198.62 square meters and the building area is 62324.16 square meters (of which the hotel area is 46252.62 square meters, the bank area is 506.88 square meters, and the underground area is 15564.66 square meters). The total investment is 180 million yuan.
The total investment of the project is 180 million yuan.

Construction Unit: Qingdao Jifa Group Co., Ltd. Postal address: 1 Jifa Road, Jimo City, Shandong Province Postcode: 266200
Contact: Liu Jian Telephone

Design institute: Qingdao University (EIA)
Postal address: 308 Ningxia Road, Shinan District, Qingdao Postcode: 266071
Contact: Kong Fanlong Telephone

Related Developments: Tower Crane Infrastructure Project

Tenor Horn

Tenor Horn,Top Class Tenor Horn,Flat Key Tenor Horn,Rose Brass Tenor Horn

ZhengOu Musical Instruments Co.,LTD , https://www.zomusical.com