Tailings re-election technology reform project environmental impact report approved

Drying equipment

On April 20th, Yunfu Environmental Protection Bureau hosted the expert review meeting of "Guangdong Guangye Yunsu Mining Industry Co., Ltd. Tailings Re-election Technical Transformation Project Environmental Impact Report" hosted by Yunsu Group. The environmental assessment of this technical reform project was unanimously approved by the expert group. .

The meeting invited six experts to form an environmental assessment expert group. The participating experts and representatives surveyed the project site, listened to the project construction and the main contents of the report, and formed a review opinion after serious discussion. It is believed that the environmental impact report of the tailings re-election technical reform project of Yunsu Mining Co., Ltd. is based on sufficient assessment criteria, the evaluation objectives are clear, and the scope of assessment is appropriate. The model, parameters and methods of forecast evaluation are basically in line with the requirements of relevant national technical guidelines and specifications. The work grade is reasonable and clear, and the evaluation conclusion is basically credible.

Dump Truck

Truck & Special Vehicle, Dump Truck,Tank Truck ,Tractor Truck

Earthmoving Machinery,Special Vehicle Co., Ltd. , http://www.nbagriculturalmachinery.com