On April 29, 2013, the Chicago Fire Department received a call about a car wash on fire in Englewood. Engine 47 was the first to arrive and reported a large one-story bow-string truss roof commercial building engulfed in flames. Due to the severity of the fire, a Still & Box alarm was requested. The 18th Battalion arrived shortly after and ordered a defensive strategy because of the unstable truss roof and heavy fire conditions. A 2-11 alarm was then activated by the 18th Battalion.
Tower Ladder 34, Tower Ladder 37, and Squad 5A were deployed for aerial operations. Despite the intense fire, the situation escalated further, prompting a 3-11 alarm to be called in by the Assistant Deputy Fire Commissioner. Firefighters operated in a defensive mode for approximately two hours before the alarm was eventually reduced by the Deputy Fire Commissioner.
The following companies responded to the incident:
**Still Alarm Companies:**
Engines 47/60, Tower Ladder 37, Truck 15, Squad 5, Command Van 2-7-4, and both the 17th and 18th Battalions.
**Box Alarm Companies:**
Engines 63/45, Truck 51, along with the 21st and 23rd Battalions.
**2-11 Alarm Companies:**
Engines 54/72/84, Truck 16, Tower Ladder 34, Engine 28 with Light Wagon 5, the 15th and 20th Battalions, and 6-4-4.
**3-11 Alarm Companies:**
Engines 39/123/116/50/49, and 5-7-1.
These photos were taken by Dennis Walus and capture the intensity of the fire that burned for several hours. The structure was completely consumed, and firefighters worked tirelessly to contain the blaze from a safe distance. If you'd like to see more images from this incident, you can view them at the link below.
[View More Photos](http://www.detroitfiregroundimages.com/Fire-Scenes/Chicago-3-11-Alarm-68th/29196148_Sm6qv2#!i=2487621822&k=SH3S63H)
Vertical Cement Silo
Vertical Cement Silo
Product Advantages
1.Waterproof, moistureproof, prevent the loss of cement, reduce urban air pollution, small footprint, long service life and low cost. It is the environmentally friendly construction machinery promoted widely in China.
2.We have a lot of stock of bulk cement silo in general Capacity :100t,150t,200t,300t. It can be produced in different size according to user`s requirements.
3. The cement silo is generally cylindrical structure. There are a dust removal equipment on it to prevent dust leakage and a brake device under it to prevent dust caking, so the powder can be discharged smoothly.
Cement silo working principle:
1.Bulk cement truck transports the cement to the site.
2. Conveying the cement in truck to cement silo by the air pressure of the truck.
3. Conveying the cement in cement silo to the Concrete Mixer by the Screw Conveyor.
Installation; Debugging; Training; Maintenance.
A.When training your operators, our engineer will give them advice on how to operate the machines correctly and provide the construction program.
B.We will send you the operation manual which can help you operate the machines properly and solve some common problems.
C.Call us at any time if you have problem with our concrete plant.
D.If necessary, we will send engineers to your site to solve your problem.
E.Spare parts supply
Vertical Cement Silo,Cement Concrete Silos,Cement Silo Trailers,Cement Horizontal Silos
Zhengzhou XinFeng machinery manufacturing Co. Ltd , https://www.xinfengmachinery.com